Well · API 42-505-33259
DERLY 4
WatchHILCORP ENERGY COMPANY · Zapata County
Summary
DERLY 4 is a gas well in the Wills Point formation, completed on 1994-12-13 at a depth of 10,800 feet in Zapata County. It is operated by Hilcorp Energy Company on the Derly lease. The lease's production shows 0 oil and 0 gas for 2026, 2025 and 2024, with 38 gas in 2022 and 482 gas in 2020.
DERLY 4AI-written from the cited RRC records. Snapshot 2026-11-07.
Source: RRC, data as of: Statewide API Data 2026-11-07, P-5 Organization 2026-10-22, PDQ dump 2026-10-27, Drilling Permits 2026-11-07
Facts
- Operator
- HILCORP ENERGY COMPANY
- County
- Zapata County
- Lease
- DERLY
- Well type
- Not filed
- Completion date
- 1994-12-13
- Plug date
- Not filed
- Formation
- WILLS POINT
- Total depth
- 10,800
Production is reported by lease. See the lease page. DERLY
Well logs
Well log images are a different RRC archive. Not in this snapshot.
Map
Well locations are not in the RRC datasets loaded here, so this well has no pin on a map.